Forward plan

Forward Plan of Executive Decisions 4 September 2017  (04/09/2017 to 02/10/2017)

Plan items
No. Item

PART 1 – FORWARD PLAN OF KEY DECISIONS

PREVIOUSLY ADVERTISED DECISIONS

1.

Sale of Bretton Court, Bretton North - KEY/24JUL15/05

Decision maker:  Cabinet Member for Resources

Decision due:   July 2017

Lead officer:  Jane McDaid

Notice of proposed decision first published: 26/06/2015

Relevant Scrutiny Committee: Growth, Environment & Resources

2.

Direct Payment Support Service - DEC17/CMDN/69

Decision maker:  Deputy Leader and Cabinet Member for Integrated Adult Social Care and Health

Decision:   Not before 5th Dec 2017

Lead officer:  Rajnish Ahuja

Decision status:  Recommendations Approved

Notice of proposed decision first published: 13/11/2015

Relevant Scrutiny Committee: Adults and Communities Scrutiny Committee

3.

Personal Care and Support (Homecare) in Peterborough - KEY/02MAY16/01

Decision maker:  Deputy Leader and Cabinet Member for Integrated Adult Social Care and Health

Decision:   2 Aug 2018

Lead officer:  Rajnish Ahuja

Decision status:  Recommendations Approved

Notice of proposed decision first published: 01/04/2016

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
Appendix 2, in formation on unsuccessful providers, is NOT FOR PUBLICATION in accordance with paragraph(s) 3 of Schedule 12A of Part 1 of the Local Government Act 1972 in that it contains commercially sensitive information relating to the business affairs of the Council and other organisations The public interest test has been applied to the information contained within the exempt annex and it is considered that the need to retain the information as exempt outweighs the public interest in disclosing it as to do so.

Relevant Scrutiny Committee: Adult and Communities

4.

Market Position Statement - KEY/08AUG16/01

Decision maker:  Deputy Leader and Cabinet Member for Integrated Adult Social Care and Health

Decision due:   July 2017

Lead officer:  Oliver Hayward

Notice of proposed decision first published: 08/07/2016

Relevant Scrutiny Committee: Adult and Communities

5.

Award of Contract for Construction and Operation of Fengate Household Recycling Centre - AUG17/CMDN/34

Decision maker:  Cabinet Member for Waste and Street Scene

Decision:   July 2017

Lead officer:  Richard Pearn

Decision status:  Recommendations Approved

Notice of proposed decision first published: 05/08/2016

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
The decision will include an exempt annexe. By virtue of paragraph 3, information relating to the financial or business affairs of any particular person (including the authority holding that information).

Relevant Scrutiny Committee: Growth, Environment & Resources

6.

Uncollectable debts in excess of £10,000 - KEY/28NOV16/01

Decision maker:  Cabinet Member for Resources

Decision:   Not before 5th Feb 2018

Lead officer:  Peter Carpenter

Decision status:  Recommendations Approved

Notice of proposed decision first published: 28/10/2016

Relevant Scrutiny Committee: Growth, Environment & Resources

7.

Peterborough Serco Strategic Partnership Contract Amendments - MAR18/CMDN/114

Decision maker:  Cabinet Member for Resources

Decision:   Not before 23rd Mar 2018

Lead officer:  Peter Carpenter

Decision status:  Recommendations Approved

Notice of proposed decision first published: 28/10/2016

Anticipated restriction: Part exempt  - view reasons

Relevant Scrutiny Committee: Growth, Environment & Resources

8.

Serco ICT Contract Amendments - continuation of the AWS Cloud based service - KEY/28NOV16/03

Decision maker:  Cabinet Member for Resources

Decision:   February 2018

Lead officer:  Peter Carpenter

Decision status:  Recommendations Approved

Notice of proposed decision first published: 28/10/2016

Reason for urgency:
With the approval of the Chairman of the Growth, Environment and Resources Scrutiny Committee the Special Urgency and waiver of call-in procedures have been invoked to suspend the requirement to publish the decision for 5 days prior to publication and to waive the ability for the decision to be called-in. The current contract with Arcus Global Limited expires on 31st March 2018 necessitating a replacement contract to be in place by 1st April 2018. To bring control and management of the AWS estate closer to PCC, the decision has been taken to remove Arcus Global from supply chain by procuring AWS services directly G-Cloud 9 Framework Agreement (as covered by this CMDN) as well as the management service/support wrap also previously provided by Arcus.

Relevant Scrutiny Committee: Growth, Environment & Resources

9.

Section 256 Agreement Care at Home KEY/12DEC16/01

Decision maker:  Deputy Leader and Cabinet Member for Integrated Adult Social Care and Health

Decision due:   October 2017

Lead officer:  Rajnish Ahuja

Decision status:  Abandoned

Notice of proposed decision first published: 11/11/2016

Relevant Scrutiny Committee: Adults and Communities

10.

Oakdale Primary School Expansion KEY/6FEB17/01

Decision maker:  Cabinet Member for Education Skills and University

Decision:   Not before 13th Sep 2017

Lead officer:  Sharon Bishop

Decision status:  Recommendations Approved

Notice of proposed decision first published: 06/01/2017

Relevant Scrutiny Committee: Children and Education Scrutiny Committee

11.

Discretionary rate relief

Decision maker:  Cabinet Member for Resources

Decision:   November 2017

Lead officer:  Vicki Palazon

Decision status:  Recommendations Approved

Notice of proposed decision first published: 20/01/2017

Relevant Scrutiny Committee: Growth, Environment & Resources Scrutiny Committee

12.

Agile Working Devices - KEY/06MAR17/05

Decision maker:  Cabinet Member for Resources

Decision due:   July 2017

Lead officer:  Vicki Palazon

Decision status:  Abandoned

Notice of proposed decision first published: 03/02/2017

Relevant Scrutiny Committee: Growth, Environment and Resources Committee

13.

Affordable Warmth Strategy 2019 - 2021 - KEY/17APR17/03

Decision maker:  Cabinet Member for Communities

Decision due:   November 2020

Lead officer:  Sharon Malia

Decision status:  Abandoned

Notice of proposed decision first published: 17/03/2017

Relevant Scrutiny Committee: Adults and Communities

14.

Provision Of Temporary Accommodation - KEY/17APR17/04

Decision maker:  Cabinet Member for Resources

Decision due:   Not before 7th Jul 2017

Lead officer:  Oliver Hayward

Notice of proposed decision first published: 17/03/2017

Relevant Scrutiny Committee: Adults and Communities

15.

Approval for Junction 18 (Rhubarb bridge) highway works - KEY/01MAY17/02

Decision maker:  Cabinet Member for Growth, Planning, Housing and Economic Development

Decision due:   Not before 9th Aug 2017

Lead officer:  Lewis Banks

Decision status:  Implemented

Notice of proposed decision first published: 31/03/2017

Relevant Scrutiny Committee: Growth, Environment and Resources Scrutiny Committee

16.

Town Hall South - remodelling - KEY/01MAY17/04

Decision maker:  Cabinet Member for Resources

Decision due:   November 2017

Lead officer:  Jane McDaid

Decision status:  Abandoned

Notice of proposed decision first published: 31/03/2017

Relevant Scrutiny Committee: Growth, Environment and Resources Scrutiny Committee

17.

Authorise the award of the Nene Bridge Bearings Scheme - FEB18/CMDN/109

Decision maker:  Cabinet Member for Growth, Planning, Housing and Economic Development

Decision:   28 Feb 2018

Lead officer:  Peter Tebb

Decision status:  Recommendations Approved

Notice of proposed decision first published: 31/03/2017

Relevant Scrutiny Committee: Growth, Environment and Resources Scrutiny Committee

18.

Real Time Passenger Information - KEY/15MAY17/02

Decision maker:  Cabinet Member for Growth, Planning, Housing and Economic Development

Decision:   Not before 27th Mar 2018

Lead officer:  Peter Tebb

Decision status:  Recommendations Approved

Notice of proposed decision first published: 13/04/2017

Anticipated restriction: Open  - view reasons

Relevant Scrutiny Committee: Growth, Environment and Resources Scrutiny Committee

19.

Approval to early infrastructure works to facilitate the design and build of two new schools on the Paston Reserve site - KEY/15MAY17/03

Decision maker:  Cabinet Member for Growth, Planning, Housing and Economic Development

Decision due:   May 2018

Decision status:  Abandoned

Notice of proposed decision first published: 13/04/2017

Relevant Scrutiny Committee: Growth, Environment and Resources Scrutiny Committee

20.

Paston Reserve Primary School - New school build project - KEY/15MAY17/04

Decision maker:  Leader of the Council and Member and Deputy Mayor of the Cambridgeshire and Peterborough Combined Authority

Decision due:   February 2018

Lead officer:  Emma Everitt

Decision status:  Abandoned

Notice of proposed decision first published: 13/04/2017

Relevant Scrutiny Committee: Children and Education Scrutiny Committee

21.

Paston Reserve Secondary School - New build project - KEY/15MAY17/05

Decision maker:  Leader of the Council and Member and Deputy Mayor of the Cambridgeshire and Peterborough Combined Authority

Decision due:   February 2018

Decision status:  Abandoned

Notice of proposed decision first published: 13/04/2017

Relevant Scrutiny Committee: Children and Education Scrutiny Committee

22.

Enterprise Managed Services Contract - KEY/15MAY17/06

Decision maker:  Cabinet

Decision due:   18 Dec 2017

Lead officer:  James Collingridge

Decision status:  Abandoned

Notice of proposed decision first published: 13/04/2017

Relevant Scrutiny Committee: Growth, Environment and Resources Scrutiny Committee

23.

Payment Strategy - KEY/29MAY17/03

Decision maker:  Cabinet

Decision:   September 2017

Lead officer:  Vicki Palazon

Decision status:  Recommendations Approved

Notice of proposed decision first published: 28/04/2017

Relevant Scrutiny Committee: Growth, Environment and Resources Scrutiny Committee

24.

Approval to award places on the Pseudo DPS for Residential Care Providers - KEY/29MAY17/04

Decision maker:  Deputy Leader and Cabinet Member for Integrated Adult Social Care and Health

Decision:   Not before 18th Dec 2018

Lead officer:  Gary Jones

Decision status:  Recommendations Approved

Notice of proposed decision first published: 28/04/2017

Relevant Scrutiny Committee: Adults and Communities Scrutiny Committee

25.

Woodston Expansion - FEB18/CMDN/93

Decision maker:  Cabinet Member for Education Skills and University

Decision:   February 2018

Lead officer:  Sharon Bishop

Decision status:  Recommendations Approved

Notice of proposed decision first published: 26/05/2017

Relevant Scrutiny Committee: Children and Education Scrutiny Committee

26.

St George's (Heltwate) remodelling - KEY/26JUNE17/02

Decision maker:  Cabinet Member for Education Skills and University

Decision:   Not before 3rd Nov 2017

Originally due:   22 Oct 2017

Lead officer:  Sharon Bishop

Decision status:  Recommendations Approved

Notice of proposed decision first published: 26/05/2017

Relevant Scrutiny Committee: Children and Education Scrutiny Committee

27.

Approval of Sharing Officers between Peterborough City Council & Other Authorities KEY/10JUL17/01

Decision maker:  Cabinet Member for Resources

Decision due:   February 2018

Lead officer:  Paul Smith

Decision status:  Abandoned

Notice of proposed decision first published: 09/06/2017

Relevant Scrutiny Committee: Growth, Environment and Resources Scrutiny Committee

28.

Award of Contract - Social Care Platform - KEY/24JULY17/01

Decision maker:  Cabinet Member for Resources

Decision due:   February 2019

Lead officer:  Peter Carpenter

Decision status:  Abandoned

Notice of proposed decision first published: 23/06/2017

Relevant Scrutiny Committee: Growth, Environment and Resources

29.

Award of Contract - Social Care e-marketplace - KEY/24JULY17/02

Decision maker:  Cabinet Member for Resources

Decision due:   February 2019

Lead officer:  Peter Carpenter

Decision status:  Abandoned

Notice of proposed decision first published: 23/06/2017

Relevant Scrutiny Committee: Growth, Environment and Resources Scrutiny Committee

30.

Thomas Deacon Academy - Award of Contract for Building Works - AUG17/CMDN/32

Decision maker:  Cabinet Member for Education Skills and University

Decision:   Not before 22nd Aug 2017

Lead officer:  Brian Howard

Decision status:  Recommendations Approved

Notice of proposed decision first published: 23/06/2017

Relevant Scrutiny Committee: Children and Education

31.

Enabling Works To Celta Road and Re-modelling of Car Park at Belsize Community Centre - NOV17/CMDN/52

Decision maker:  Cabinet Member for Growth, Planning, Housing and Economic Development

Decision:   Not before 14th Nov 2017

Lead officer:  Sharon Bishop

Decision status:  Recommendations Approved

Notice of proposed decision first published: 23/06/2017

Relevant Scrutiny Committee: Children and Education

32.

Award of Contract - Social Care Operating Model - KEY/24JULY17/05

Decision maker:  Cabinet Member for Resources

Decision due:   February 2019

Lead officer:  Peter Carpenter

Decision status:  Abandoned

Notice of proposed decision first published: 23/06/2017

Relevant Scrutiny Committee: Growth, Environment and Resources

33.

Acquisition of Regeneration Site - KEY/24JULY17/06

Decision maker:  Cabinet Member for Resources

Decision due:   February 2019

Lead officer:  Peter Carpenter

Decision status:  Abandoned

Notice of proposed decision first published: 23/06/2017

Relevant Scrutiny Committee: Growth, Environment and Resources

34.

Approval to enter a Section 76 agreement with Cambridgeshire and Peterborough Clinical Commissioning Group - AUG17/CMDN/33

Decision maker:  Cabinet Member for Children's Services

Decision:   Not before 22nd Aug 2017

Lead officer:  Pam Setterfield

Decision status:  Recommendations Approved

Notice of proposed decision first published: 23/06/2017

Relevant Scrutiny Committee: Children and Education

35.

Construction of New School Building - Heltwate School - KEY/24JUL17/08

Decision due:   1 Nov 2017

Lead officer:  Sharon Bishop

Notice of proposed decision first published: 23/06/2017

Relevant Scrutiny Committee: Children and Education

36.

Locally Designed and Administered Business Rates Relief Scheme

Decision maker:  Cabinet Member for Resources

Decision:   January 2018

Lead officer:  Peter Carpenter

Decision status:  Recommendations Approved

Notice of proposed decision first published: 06/07/2017

Relevant Scrutiny Committee: Growth, Environment and Resources Scrutiny Committee

37.

Academy Conversion (Jack Hunt Group) of Jack Hunt School - FEB18/CMDN/103

Decision maker:  Cabinet Member for Education Skills and University

Decision:   Not before 16th Feb 2018

Lead officer:  Sharon Bishop

Decision status:  Recommendations Approved

Notice of proposed decision first published: 06/07/2017

Relevant Scrutiny Committee: Children and Education

38.

Academy Conversion (Jack Hunt Group) of Middleton Primary School - FEB18/CMDN/101

Decision maker:  Cabinet Member for Education Skills and University

Decision:   Not before 16th Feb 2018

Originally due:   6 Aug 2017

Lead officer:  Sharon Bishop

Decision status:  Recommendations Approved

Notice of proposed decision first published: 06/07/2017

Relevant Scrutiny Committee: Children and Education

39.

Academy Conversion (Jack Hunt Group) of Longthorpe Primary School - FEB18/CMDN/102

Decision maker:  Cabinet Member for Education Skills and University

Decision:   Not before 16th Feb 2018

Lead officer:  Sharon Bishop

Decision status:  Recommendations Approved

Notice of proposed decision first published: 06/07/2017

Relevant Scrutiny Committee: Children and Education

40.

Academy Conversion (Jack Hunt Group) of Thorpe Primary School - FEB18/CMDN/100

Decision maker:  Cabinet Member for Education Skills and University

Decision:   Not before 16th Feb 2018

Lead officer:  Sharon Bishop

Decision status:  Recommendations Approved

Notice of proposed decision first published: 06/07/2017

Relevant Scrutiny Committee: Children and Education

41.

Academy Conversion (Jack Hunt Group) of Ravensthorpe Primary School - FEB18/CMDN/99

Decision maker:  Cabinet Member for Education Skills and University

Decision:   Not before 16th Feb 2018

Lead officer:  Emma Everitt

Decision status:  Recommendations Approved

Notice of proposed decision first published: 06/07/2017

Relevant Scrutiny Committee: Children and Education

42.

Academy Conversion (Soke Educational Trust) Werrington Primary School - KEY/07AUG17/07

Decision maker:  Cabinet Member for Education Skills and University

Decision:   Not before 29th Nov 2017

Lead officer:  Emma Everitt

Decision status:  Recommendations Approved

Notice of proposed decision first published: 06/07/2017

Relevant Scrutiny Committee: Children and Education

43.

Academy Conversion (Soke Educational Trust) of Gunthorpe Primary School - KEY/07AUG17/08

Decision maker:  Cabinet Member for Education Skills and University

Decision:   Not before 29th Nov 2017

Lead officer:  Emma Everitt

Decision status:  Recommendations Approved

Notice of proposed decision first published: 06/07/2017

Relevant Scrutiny Committee: Children and Education

44.

Academy Conversion (Soke Educational Trust) of John Clare Primary School - KEY/07AUG17/09

Decision maker:  Cabinet Member for Education Skills and University

Decision:   Not before 29th Nov 2017

Lead officer:  Emma Everitt

Decision status:  Recommendations Approved

Notice of proposed decision first published: 06/07/2017

Relevant Scrutiny Committee: Children and Education

45.

Academy Conversion (Soke Educational Trust) of Wittering Primary School - KEY/07AUG17/10

Decision maker:  Cabinet Member for Education Skills and University

Decision:   Not before 29th Nov 2017

Lead officer:  Emma Everitt

Decision status:  Recommendations Approved

Notice of proposed decision first published: 06/07/2017

Relevant Scrutiny Committee: Children and Education

46.

Replacement Social Care System For Adult Social Care - KEY/21AUG17/01

Decision maker:  Deputy Leader and Cabinet Member for Integrated Adult Social Care and Health

Decision due:   May 2018

Lead officer:  Caroline Townsend

Decision status:  Abandoned

Notice of proposed decision first published: 21/07/2017

Relevant Scrutiny Committee: Adults and Communities

47.

Approval of Entering Into Contracts With Residential and Nursing Home Providers In Accordance With Service User Choice of Home Via The Pseudo Dynamic Purchasing System as recommended by the PCC Legal Department - KEY/21AUG17/02

Decision maker:  Deputy Leader and Cabinet Member for Integrated Adult Social Care and Health

Decision due:   February 2018

Lead officer:  Helene Carr

Decision status:  Abandoned

Notice of proposed decision first published: 21/07/2017

Relevant Scrutiny Committee: Adults and Communities Scrutiny Committee

48.

Engagement Strategy - KEY/21AUG17/03

Decision maker:  Cabinet

Decision:   25 Sep 2017

Lead officer:  Vicki Palazon

Decision status:  Recommendations Approved

Notice of proposed decision first published: 21/07/2017

Relevant Scrutiny Committee: Growth, Environment & Resources Scrutiny Committee

49.

Acquisition of a property in the City Centre - KEY/21AUG17/04

Decision maker:  Cabinet Member for Resources

Decision:   Not before 29th Aug 2017

Lead officer:  Jane McDaid

Decision status:  Recommendations Approved

Notice of proposed decision first published: 21/07/2017

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
The decision will include an exempt annexe. By virtue of paragraph 3, information relating to the financial or business affairs of any particular person (including the authority holding that information).

Relevant Scrutiny Committee: Growth, Environment & Resources Scrutiny Committee

PART 2 - NOTICE OF INTENTION TO TAKE DECISIONS IN PRIVATE

None

PART 3 - NOTICE OF NON-KEY DECISIONS

PREVIOUSLY ADVERTISED DECISIONS

1.

Vivacity Funding

Decision maker:  Cabinet Member for Resources

Decision due:   April 2018

Lead officer:  Ian Phillips

Notice of proposed decision first published: 30/10/2015

Relevant Scrutiny Committee: Growth, Environment & Resources

2.

Vivacity Premier Fitness - Invest to Save Scheme

Decision maker:  Cabinet Member for Resources

Decision due:   February 2018

Lead officer:  Peter Carpenter

Decision status:  Abandoned

Notice of proposed decision first published: 24/08/2015

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
The decision may contain information relating to the financial or business affairs of any particular person (including the authority holding that information).

Relevant Scrutiny Committee: Growth, Environment & Resources

3.

Delivery of the Council's Capital Receipt Programme through the sale of Welland House, Dogsthorpe

Decision maker:  Cabinet Member for Resources

Decision due:   July 2018

Lead officer:  David Gray

Notice of proposed decision first published: 26/06/2015

Relevant Scrutiny Committee: Growth, Environment & Resources

4.

Proposal for Loan of Senior Management Staff Under Joint Arrangements

Decision maker:  Cabinet Member for Resources

Decision due:   February 2019

Lead officer:  Fiona McMillan

Decision status:  Abandoned

Notice of proposed decision first published: 02/09/2016

Relevant Scrutiny Committee: Growth, Environment & Resources

5.

Funding of Information, Advice and Guidance services within the voluntary sector

Decision maker:  Cabinet Member for Finance and Corporate Governance

Decision:   July 2019

Lead officer:  Ian Phillips

Decision status:  Recommendations Approved

Notice of proposed decision first published: 09/12/2016

Relevant Scrutiny Committee: Growth, Environment & Resources

6.

Daily cleanse around Gladstone Street and nearby streets

Decision maker:  Cabinet Member for Waste and Street Scene

Decision due:   February 2019

Lead officer:  James Collingridge

Decision status:  Abandoned

Notice of proposed decision first published: 31/03/2017

Relevant Scrutiny Committee: Growth, Environment and Resources Scrutiny Committee

7.

A Lengthmans to be deployed on Lincoln Road Millfield

Decision maker:  Cabinet Member for Waste and Street Scene

Decision due:   March 2020

Lead officer:  James Collingridge

Decision status:  Abandoned

Notice of proposed decision first published: 31/03/2017

Relevant Scrutiny Committee: Growth, Environment and Resources Scrutiny Committee

8.

2017/18 VCS grant funding

Decision maker:  Cabinet Member for Finance and Corporate Governance

Decision due:   October 2019

Lead officer:  Ian Phillips

Decision status:  Abandoned

Notice of proposed decision first published: 31/03/2017

Relevant Scrutiny Committee: Adults and Communities Scrutiny Committee

9.

Council Tax Support Scheme consultation

Decision maker:  Cabinet

Decision:   20 Nov 2017

Lead officer:  Peter Carpenter

Decision status:  Recommendations Approved

Notice of proposed decision first published: 21/07/2017

Relevant Scrutiny Committee: 

KEY DECISIONS TAKEN UNDER URGENCY PROCEDURES

None